Search 
Home > Mining & Minerals > Iron Ore
Nalo Baru

Nalo Baru is an iron ore concession located within the District of Nalo Baru, in the Merangin Regency, of the Jambi Province (Sumatra), Indonesia. The concession is spread over 438 hectares and has iron ore reserves of 164,000,000 (164 million) tonnes. It offers exceptionally good magnetite iron ore at 63+ grade.

Geography & Geology

The Nalo Baru iron ore concession is located in the District of Nalo Tantan, Province of Jambi, Indonesia. It is situated approximately 38 kilometres west of the city of Bangko, the capital city of the Merangin Regency.

The iron mineralization in the concession area is contained throughout the Permian aged Palepat Formation. The Palepat Formation is composed of andesites, dacites and dolerites, with intercalations of tuff, volcanic breccia, shale, siltstone, sandstone, claystone, and conglomerate. The sedimentary rocks are slightly altered (thermally) by the tantan granite, a triassic granitic intrusion near the concession area.

The presence of iron deposits in the palepat formation has been hypothesized to be the result of a contact metamorphism between the lithic tuff and the granitic intrusion.

Exploration and Production

Production at the Nalo Baru site commenced in May 2009 with a initial production target of 3,000,000 (3 million) tonnes per annum. Extensive activities have been carried out on this green field project resulting in land clearing, construction of relevant infrastructure and site facilities. More than $10 million USD has been spent on camp construction and relevant equipment; with a drastic 8-fold increase in the number of personnel on-site. The company is currently supplying iron from this mine concession to various Asian markets.



 

Quality 63+ 
Total Area  438Ha 
Reserves (In million tonnes) 164 
Licenses till stage Exploitation
Pre Mining Geology and Mine Plan and Reserve Estimate StudyDone. Currently in the production stage.
International Port Teluk Bayur, Padang (380 kms) / Anchor Loading 
Alternate Port Bengkulu Port (300 km) / Barge Loading 
Nearest Major CityJambi
Nearest TownBangko  
Distance to main highway and quality of highway32kms. Excellent road facilities upto all ports.  
Quality of internal roadsNewly built road from stockpile to mining area
HaulingThe nearby town Muara Bungo is a major mining hub, hence big between 17-21 USD/ ton               


Map
Please click on the thumbnail below to view

Iron Ore Lump First Shipment
Iron Ore Lump First Shipment 1
Nalo Baru Iron Ore
Send a product inquiry
Product inquiries are expected from prospective buyer. All Fields are required. Your details will only be used to reply to your inquiry.
 Iron Ore  Uranium  Coal  Zinc  Copper